Tasks / Issues
Work · Tasks · saved view
Issues ◆ Typed task view
Failure-typed tasks — ◆ Inspection finding and ⚡ Fault code — in one triage lens. Same Task entity as Tasks, filtered; nothing here is a second module. 5 open across the fleet; EX-214 alone has 2 open findings plus a fault cluster.
Loading the Issues view… (skeleton shimmer pauses under reduced motion)
✓
All clear — no open issues
No open inspection-finding or fault-code tasks anywhere in the fleet. New ones appear here automatically the moment a walk-around answer fails or a fault code lands — there's no manual "add issue" form because an issue is just a typed task.
Run an inspection
View completed (2)
Completed failure-typed tasks (and their recurrence history and root-cause Jots) stay searchable even when nothing is open.
T-2205
✓ Inspection finding
▲ In progress
○ Cached
Replace hydraulic return hose
EX-214 · from finding "hydraulic leak" · Silloth Yard
SLA frozen — 6h 12m left (as of 7:02 AM)
T-2129
✓ Inspection finding
▲ In progress
○ Cached
Brake pad wear
DT-330 · Bridgeport
SLA frozen — ⚠ BREACHED +2d
T-2140
⚡ Fault code
○ To do
Engine derate warning SPN 3364/FMI 5
EX-214 · Silloth Yard · ⟳ ×6 occurrences
SLA frozen — 1d 4h left
Showing 3 of 7 cached. Reconnect for the full view and live SLA clocks.
T-2205
Replace hydraulic return hose
✓ Inspection finding
▲ High (from finding)
○ Cached 7:02 AM
EX-214 · 2 open findings · Silloth Yard
SLA
SLA — frozen offline◇ Design-ahead
Due 3:20 PM today (last known)
6h 12m left
Escalation and re-arm resume automatically on reconnect. The deadline itself doesn't move.
Related tasks (1)
Torque-check boom fittings after hose replacementT-2214
○ To do○ Cached
Task edits queue offline like any owned work — no special case: follow-up work is just another task.
T-2205
✓ Inspection finding
▲ In progress
Replace hydraulic return hose
EX-214 · from finding "hydraulic leak" · Silloth Yard
⏱ SLA 6h 12m left
T-2201
✓ Inspection finding
○ To do
Cracked mirror housing
EX-214 · Silloth Yard
⏱ SLA 2d 20h left
T-2140
⚡ Fault code
○ To do
Engine derate warning SPN 3364/FMI 5
EX-214 · Silloth Yard · ⟳ ×6 occurrences, last 8:12 AM
⏱ SLA 1d 4h left
T-2129
✓ Inspection finding
▲ In progress
Brake pad wear
DT-330 · Bridgeport
⚠ SLA BREACHED +2d
⚠ Escalated to Ops Manager · 2 d ago
T-2110
✓ Inspection finding
○ To do
Loose fitting, boom cylinder
RL-88 · North Ridge
⏱ SLA 3d 6h left
T-2032
✓ Inspection finding
● Completed
Hydraulic leak (recurrence #2)
EX-214 · completed 2026-05-12
T-1998
✓ Inspection finding
● Completed
Hydraulic leak (root cause origin)
EX-214 · completed 2026-03-02
T-2205 selected below. In the shipped product, clicking a row swaps the detail pane on the right — it's the same task you'd open from Tasks.
T-2205
Replace hydraulic return hose
✓ Inspection finding
▲ High (from finding)
Hydraulics
#leak
#hose
#field-reported
EX-214 · CAT 320 GC excavator · 2 open findings on this asset · Silloth Yard
Inspection finding"Hydraulic leak" · 7:15 AM walk-around
→
Task · typed ✓ (this view)T-2205 replace return hose
→
Work order · relates for billingWO-1042
Source & links
SourceFailed walk-around item "Hydraulic leak" — Daily pre-op inspection, submitted 7:15 AM by Marco (offline, synced 8:42)
AssetEX-214 — CAT 320 GC · Silloth Yard
ComponentHydraulic return line
Work orderWO-1042 — relates to this task for billing; the WO is not its parent, and this task stays assigned, tracked, and shareable on its own
CategoryHydraulics
LifecycleTask statuses — same engine as every task
✓To do
▲In progress
○Completed
▲ In progress
No 8-state issue machine — an issue moves through the same four task statuses. "⊘ Mark cancelled" is a terminal branch, not a step on the track.
Related tasks (1)
Torque-check boom fittings after hose replacementT-2214 · assigned Marco
○ To do
Open task
Also relates to WO-1042 (billing relation).
Follow-up work is just more tasks. Corrective Actions — a second entity with its own approval/sign-off lifecycle — were descoped for launch (founder ruling 2026-07-08).
SLA
SLA — High severity · Silloth Yard◇ Design-ahead
Due 3:20 PM today
6h 12m left
⏱ Due soon
Escalates automatically to the Site Lead if not Completed by the deadline. Proposed high-severity hydraulics targets: triage in 1h, complete within 8 business hours. Targets attach to the task's type + severity, not to a separate issue object.
Recurrence◇ Design-ahead
Recurs — 3rd time this quarter. Same failure mode reported on EX-214 twice before, as earlier tasks.
T-2032Hydraulic leak — completed 2026-05-12
T-1998Hydraulic leak — completed 2026-03-02
▤
Root-cause Jot: "EX-214 hydraulic wear pattern" — hose routing rubs the boom pivot under full extension. Documented after the 2nd recurrence; not yet resolved permanently.
Timeline
7:15 AM
Task created from failed inspection finding "Hydraulic leak" — typed ✓ Inspection finding
● Marco · offline, synced 8:42
7:16 AM
Severity High set from the source finding · category Hydraulics
⚡ Auto-type rule
7:20 AM
SLA clock started — due 3:20 PM (design-ahead)
⚡ Automation
8:50 AM
Assigned to Marco Reyes · renamed "Replace hydraulic return hose" at triage
● Dana
9:00 AM
Related to WO-1042 for billing
● Dana
9:20 AM
Status → In progress
● Marco
11:10 AM
Follow-up task T-2214 "Torque-check boom fittings" created
● Marco
pending
SLA due 3:20 PM · 6h 12m left (design-ahead)
DESIGN MOCKUP — GearJot V2 · C2e·Straight (imported from cowork 2026-07-06) · design target, not a screenshot.
Tokens: foundation-tokens-vC2e-straight.json (every ratio computed) · gloved 44/48px floors · status = glyph + label, never color alone.
Reframed 2026-07-09 per founder rulings 2026-07-08: an issue = a typed task view of the built Task entity (no standalone Issue object); Corrective Actions descoped for launch; a Work Order relates to tasks (billing relation, not parent).
Still designed ahead of build on this view (tagged on-screen): the SLA countdown/escalation overlay and recurrence chains. The earlier "is CA sign-off offline-queued?" tension is closed by the CA descope.
← Prototype home
Tokens: foundation-tokens-vC2e-straight.json (every ratio computed) · gloved 44/48px floors · status = glyph + label, never color alone.
Reframed 2026-07-09 per founder rulings 2026-07-08: an issue = a typed task view of the built Task entity (no standalone Issue object); Corrective Actions descoped for launch; a Work Order relates to tasks (billing relation, not parent).
Still designed ahead of build on this view (tagged on-screen): the SLA countdown/escalation overlay and recurrence chains. The earlier "is CA sign-off offline-queued?" tension is closed by the CA descope.
← Prototype home