Work · Work orders · 10 total
Work orders
The money spine: something's wrong → work gets authorized, costed, and — when it's chargeable — billed.
| WO | Title | Gear | Customer | Status | Tasks | Cost | Billable | Age / SLA | |
|---|---|---|---|---|---|---|---|---|---|
Loading work orders… (skeleton shimmer pauses under reduced motion)
🔧
No work orders yet
A work order is the authorization envelope: something's wrong on a unit → work gets authorized, costed, and — when it's chargeable — billed. Create the first one, or load sample data to see the full lifecycle (draft through invoiced).
Sample data loads 10 realistic work orders spanning every lifecycle state, including one flagged by an SLA automation.
○ Cached · last synced 7:02 AM
| WO | Title | Gear | Customer | Status | Tasks | Cost | Billable | Age / SLA |
|---|---|---|---|---|---|---|---|---|
| WO-1042 | Hydraulic return line repairfrom finding T-2205 · Silloth Yard | EX-214 | Ridgeline Construction R-2210 | ▲ In progress | 3 | $684.50 | $ Billable | 2 d |
| WO-1039 | Voltage regulator replacementfrom failed inspection · Silloth Yard | GN-042 | — | ⏸ Waiting on parts | 2 | $410.00 | ⊘ Internal | ⚠ SLA breach · 9d |
| WO-1036 | Track & tensioner replacementrental turnback | SS-107 | Ridgeline Construction R-2210 | ● Invoiced | 2 | $1,240.00 | $ Billable | 12 d |
Showing 3 of 10 cached work orders · Total (cached) $2,334.50 — reconnect for full costing & invoicing
Open work orders
7
of 10 total · not yet completed/invoiced/closed
sla risk
Waiting on parts > 7d
1
⚠ WO-1039 · SLA breach 9d
Total cost — all WOs
$3,549.50
draft WOs not yet costed excluded
Billable value
$2,019.50
3 of 10 WOs chargeable to a customer
WO status engine — 10-state lifecycle
◆ Shared status-engine rows — not a hardcoded enum
○ 1 Draft→
◆ 2 Authorized→
▤ 3 Scheduled→
▲ 4 In progress→
⏸ 5 Waiting on parts→
⚑ 6 Waiting on approval→
■ 7 On hold→
✓ 8 Completed→
● 9 Invoiced→
▣ 10 Closed
Rows 5–7 (waiting-on-parts / waiting-on-approval / on-hold) are all "blocked, needs a human" — same amber family, distinct glyph + label each. Legal next-states and per-status SLA targets are configured on the status-engine row, not hardcoded per object type.
| WO | Title | Gear | Customer | Status | Tasks | Cost | Billable | Age / SLA | |
|---|---|---|---|---|---|---|---|---|---|
| WO-1042 | Hydraulic return line repairfrom finding T-2205 · Silloth Yard | EX-214 | Ridgeline Construction R-2210 | ▲ In progress |
▸ 2 tasks
|
$684.50 | $ Billable | opened 7/05 · 2 d | |
| WO-1039 | Voltage regulator replacementfrom failed inspection · Silloth Yard | GN-042 | — | ⏸ Waiting on parts |
▸ 2 tasks
|
$410.00 | ⊘ Internal | ⚠ SLA breach · 9d | |
| WO-1040 | Re-torque basket pinsfrom 7:40 AM inspection · North Ridge | TL-511 | — | ⚑ Waiting on approval |
▸ 1 task
|
$210.00 | ⊘ Internal | 4 d — pending Dana's approval, over $200 threshold | |
| WO-1041 | Diagnose hydraulic leak sourceBridgeport | BH-109 | — | ◆ Authorized |
▸ 1 task
|
$150.00 est. | ⊘ Internal | 1 d | |
| WO-1044 | Annual DOT inspection & brake serviceNorth Ridge | DT-330 | — | ▤ Scheduled |
▸ 2 tasks
|
$260.00 est. | ⊘ Internal | scheduled 7/14 | |
| WO-1046 | Roller drum scraper replacementfrom failed inspection · Silloth Yard | RL-88 | — | ○ Draft |
▸ 1 task
|
— not costed | — TBD | drafted 10m ago | |
| WO-1033 | Light tower bulb & battery serviceBeacon Paving Co. jobsite | LT-15 | Beacon Paving Co. | ■ On hold |
▸ 2 tasks
|
$95.00 | $ Billable | on hold 3 d | |
| WO-1038 | 250-hour PM serviceYard | WL-203 | — | ✓ Completed |
▸ 3 tasks
|
$320.00 | ⊘ Internal | completed 6/29 | |
| WO-1036 | Track & tensioner replacementrental turnback | SS-107 | Ridgeline Construction R-2210 | ● Invoiced |
▸ 2 tasks
|
$1,240.00 | $ Billable | invoiced 6/20 | |
| WO-1029 | Annual compressor serviceYard | CP-77 | — | ▣ Closed |
▸ 1 task
|
$180.00 | ⊘ Internal | closed 5/02 |
10 work orders · 3 billable ($2,019.50) · 7 non-billable ($1,530.00) · Total $3,549.50
Showing 10 of 10 work orders.
Bulk actions appear when rows are selected · row expands to its task list · click a WO to open the detail.
DESIGN MOCKUP — GearJot V2 · C2e·Straight (imported from cowork 2026-07-06) · design target, not a screenshot.
Tokens: foundation-tokens-vC2e-straight.json (every ratio computed) · gloved 44/48px floors · status = glyph + label, never color alone.
Companion screen: WO-1042 detail → · ← Prototype home
Tokens: foundation-tokens-vC2e-straight.json (every ratio computed) · gloved 44/48px floors · status = glyph + label, never color alone.
Companion screen: WO-1042 detail → · ← Prototype home