Design mockup GearJot V2 · C2e·Straight · design target — not a screenshot ⇄ Wobble
Synced · 2 min ago + New DW

Loading EX-214… (skeleton shimmer pauses under reduced motion)

Fleet / EX-214
Fleet / EX-214

EX-214 — CAT 320 GC

Down Cached 7:02 AM
Excavator · Summit yard · operator unassigned
Start inspection — works offline
UnitEX-214 Hours4,182.6 FaultP0524 SerialCAT0320GCLXK10214

Work orders and GearBot need a connection — the buttons wake up on reconnect, and nothing you queued is dropped.

Fleet / EX-214

EX-214 — CAT 320 GC

Down
Excavator · Summit yard · operator unassigned
UnitEX-214 Hours4,182.6 FaultP0524 SerialCAT0320GCLXK10214 Year2021
T2 · Maintenance — this unit uses Inspections + Work orders. Next rung: telematics auto-meters (T3).
Open items
T-2205 Hydraulic return line weeping at boom base 7:15 AM · Marco · issue task from the walk-around · photo attached Open →
250-hr service Upcoming at 4,250.0 hrs · in 67.4 hrs
At a glance
Status Down
LocationSummit yard — Bay 3
CategoryExcavator
OwnershipOwned
Meter sourceTelematics · updates on sync — readings
Purchase2021 · $214,500
Photos & docs
Spec sheet PDF
Warranty PDF
Boom-base leak photo 7:15 AM
Service history
DateServiceHours at serviceByWork order
5/28250-hr service3,912.0MarcoWO-0991
2/14Repair — hose fitting3,401.5MarcoWO-0877
11/02500-hr service3,000.0DanaWO-0755
6/19250-hr service2,502.0MarcoWO-0602
Past inspections
DateTemplateResultBy
Today 7:15 AM Daily walk-around — Excavator 1 fail Marco offline-synced View
Yesterday 7:02 AM Daily walk-around — Excavator Pass Marco View
7/3 7:10 AM Daily walk-around — Excavator Pass Marco View
7/2 7:20 AM Daily walk-around — Excavator Pass Marco View
7/1 7:08 AM Daily walk-around — Excavator Pass Marco View

Never been on rent

EX-214 is an owned service unit — it has never been on rent.

See the rental board →
Activityfull history
7:15 AM
Marco completed Daily walk-around — 1 fail, photo attached Marco · offline, synced 8:42
Reported issue → task T-2205, linked to the exact question. Nothing waited for signal.
8:42 AM
Automation updated meter — hours 4,182.6 ← 4,179.1 Automation
9:00 AM
Dana opened WO-1042 — grouped 2 tasks, customer attached Dana
9:01 AM
GearBot suggested grouping 2 tasks into one work order — approved by Dana 9:00 AM GearBot · draft only
5/28
Marco closed WO-0991 — 250-hr service complete Marco
5/28
Automation updated meter — hours 3,912.0 ← 3,908.6 Automation
DESIGN MOCKUP — GearJot V2 · EX-214 gear detail · C2e·Straight (imported from cowork 2026-07-06) · design target, not a screenshot.
Tokens: foundation-tokens-vC2e-straight.json (every ratio computed) · gloved 44/48px floors · status = glyph + label, never color alone.
← Prototype home